Coordinate before details are fixed

Review switch locations, lighting groups, shading, HVAC interfaces and technical spaces with the design team before costly decisions become difficult to change.

Give each discipline a clear boundary

Record who supplies, installs, integrates and tests each interface. The scope should reduce ambiguity between architecture, electrical work and mechanical systems.

Deliver a usable design record

Scenario descriptions, control intent, infrastructure needs and acceptance criteria become coordination inputs. Final drawings and deliverables are defined per project.